
Kitchen Remodeling
Full kitchen remodels coordinated under one project lead - layout, cabinetry, countertops, flooring, and every trade in between.
See the plan before the work begins.
ProBYLT walks the existing kitchen with you before proposing changes. The scope follows how the space is actually used - traffic flow, storage, appliance placement - not just a finish package.
The consultation connects what isn't working in the current layout with what the new one needs to solve, before cabinetry or material decisions get made.
When to consider.
- Layout forces awkward traffic between the sink, stove, and refrigerator
- Cabinetry and counter space fall short of current storage needs
- Outdated wiring or plumbing limits appliance or fixture options
- A property update calls for an open-concept or expanded footprint
- Finishes show wear that no longer matches the rest of the home
A scope organized around the assembly.
- Design consultation and layout planning
- Demolition and disposal of existing cabinetry, counters, and flooring
- Electrical and plumbing rough-in for the new layout
- Cabinetry, countertop, and backsplash installation
- Flooring and finish carpentry
- Final punch list and cleanup
Each stage confirms the next one.
The sequence can adjust to the property and the selected system. Visible decisions stay tied to the work they affect.

Consult on the space
- 01
Consult on the space
ProBYLT walks the existing kitchen with you before proposing changes, connecting what isn't working in the current layout with what the new one needs to solve.
- 02
Build the design and scope
The written scope covers layout, cabinetry, countertops, flooring, finish work, and the trades involved before work begins.
- 03
Prepare the kitchen
Demolition and disposal of existing cabinetry, counters, and flooring follow the approved design.
- 04
Coordinate the trades
Electrical, plumbing, and finish carpentry run under one project lead and one schedule.
- 05
Review and walk through
A final punch list and cleanup close the project.
Useful answers before the consultation.
How long does a kitchen remodel typically take?
Timeline depends on scope - a cosmetic refresh moves faster than a full layout change involving electrical and plumbing rework. The proposal includes a project-specific timeline.
Can ProBYLT work with my existing layout, or does it require a full gut?
Both. Some kitchens need a full layout change; others just need updated cabinetry, counters, and finishes within the existing footprint. The consultation determines which fits.
Who handles the electrical and plumbing work?
ProBYLT coordinates licensed electrical and plumbing trades directly, under the same project lead and schedule as the rest of the remodel.
Keep related work in view.
Bathroom Remodeling
From a full gut to a targeted refresh - tile, vanities, showers and tubs, ventilation, and fixtures, with waterproofing treated as seriously as it is on a roof.
Open serviceBasement Finishing
Turning unused square footage into livable space - framing, insulation, egress where required, flooring, and finish work, planned around the moisture and drainage conditions underneath.
Open serviceHome Additions
Structural expansions planned from the ground up - matched to the existing roofline, siding, and exterior detail so the addition reads as part of the house, not an add-on.
Open serviceTell us about your kitchen.
A consultation request gives the team a place to begin. Add the service, ZIP code, and what you want to change.
Prefer a call? (470) 975-7337
